Imperial Point, Salford Quays
Location: Salford Quays
Scaffold Height: 69 metres
Lift Heights: 2/3 metres
Project Type: Access scaffold, Pavement Gantry
Project Overview
Craven Scaffolding were appointed to design and install a 69-metre high temporary scaffold at a building in Salford Quays. The scaffold was required to provide safe and reliable access for external repair works.
Scope of Works
The scaffold was erected with 3-metre lifts, allowing contractors to carry out work at multiple levels. The structure provided full access for:
-
Cladding repairs
-
Balcony works
-
Window repairs
The layout was planned to ensure clear access could be maintained to all live shops, whilst maintaining site safety at all times.
The Solution
Craven Scaffolding installed a robust and compliant scaffold structure, designed to meet the height requirements of the building and the demands of the repair works. Regular lift spacing ensured ease of movement and safe working platforms throughout the project.
The Result
-
Safe access up to roof level to complete all refurbishment works safely and effectively.
-
Lifts heights of 2/3m heights to gain crucial access at floor levels.
-
Supported multiple external trades.
-
Project delivered safely and to strict programme deadlines.
Craven Scaffolding successfully provided a reliable temporary access solution, allowing all external repairs to be completed safely and on schedule.